Extreme Machinery Manufacture Co., Ltd. (Jingjiang)
Products
Contact Us
  • Contact Person : Ms. Wang Joan
  • Company Name : Extreme Machinery Manufacture Co., Ltd. (Jingjiang)
  • Tel : 86-523-84858878
  • Fax : 86-523-84828148
  • Address : Jiangsu,Jingjiang,B Building, Henglong Business Center,Jingjiang,Jiangsu,China
  • Country/Region : China
  • Zip : 214500

EEC08 Foot Operating clinching machine

EEC08 Foot Operating clinching machine
Product Detailed
1. EEC08 Foot Operating clinching machine

EEC08 Foot Operating clinching machine

1. Equipment introduction

     This equipment uses the compressed-air drive, has the energy consumption to be low, the noise small, haven't the pollution, to have the soft arriving function;

     The equipment needs the clean and dry compressed-air drive, air pressure 3-6bar;

     The equipment overall is green.

2. Design manufacture basis:

     According to the technical agreement and the photo of the machine that the supply and customer confirmed each other.

Equipment main compose and technical data

    1,EEC08 air-hydraulic more force cylinder no riveting machine

       

    1.1          Air-hydraulic more force cylinder                           1SET

                        BS08-100-1

Air-hydraulic Intensifying Jar Type:   BS08-100-10

Total travel:       100mm

Reinforcement:     10mm

   When 6bar air pressure, enters traveling schedule strength: 350Kg

   When 6bar air pressure, return travel strength: 370Kg

Max.Pressure under 6bar of air pressure: 76KN

Control system:     STE-01-F-08

   Including the more force cross-over valve (external)

   Including the more force traveling schedule speed regulating valve “X” the valve

   Air control connection G1/2

Air supply:       

  After filtration dry compressed air, otherwise it will reduce the useful life of the equipment!

                 Working air pressure: Please see the Maintenance and Repairing Rules about the best working pressure.

                 Max. Air pressure: 6bar

                 Min. air pressure: 3bar

Environment temperature:   -5°C-40°C

Height above sea level:     no more than 1200m

Relative humidity:         no more than 85%

      1.2Control system   1set                  

        STE-01-F-08                                               

         The foot switch starts the electric control system (pneumatic element to use import brand)   Start the foot switch.

Under the active status, the operator put in the components locate in the mold, steps on the foot switch starting outfit, Was mad that the fluid increases the strength cylinder to enter the traveling schedule work quickly, the top die fast small strength arriving contact work piece, does not have the impact, does not have the noise, On the mold contact work piece, was mad that the fluid increases the strength cylinder automaticswitching for the strength traveling schedule, increases the strength traveling schedule to start to work to produces The riveted joint, (refers to corresponding pressure relay until the hypothesis pressure to achieve setting value), expression product riveted joint Qualified, then the pressure switch movement, controls the top die return trip. If the pressure switch cannot achieve the setting value, Shows the riveting to press the quality not to be unqualified, then the top die cannot the automatic return trip, this time probably press the emergency brake button, The compulsion equipment return trip, may remind the operators from this to inspect the reason, thus the guarantee riveted joint quality is qualified.

    The system maintenance installment (was mad that source processor trigeminy) carries on the moisture to the input dry compressed air to divide once more To, the oil atomization, and carries on steeples to the input barometric pressure adjustable, thus realizes the ramming strength not to have in the prescribed limit Level adjustable. The system brings five counters.

  1.3 Ramming equipment organism   1 set

         EEC08 standard

                Uses the whole high quality cast steel structure

                Guarantees organism rigidity and the intensity

   1.4 No riveting connection mould 1set/size

0.5+0.5mm,0.8+0.8mm,1.0+1.0mm (3 sets for free)

The customer needs to provide the sample of work piece or the material, and then we can supply the mould according to your requirement. If you can not supply the material, we will supply the mould according to our normal equipment.

EEC08 Foot Operating clinching machine



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.